A platform for research: civil engineering, architecture and urbanism
Twin zephyrs placed in service
Diesel-electric articulated trains, built by Edward G. Budd Mfg Co, Philadelphia, and embodying Budd Shotweld stainless-steel construction, operates on 6 1/2-hr schedule between Chicago and St Paul; test run of 431 mi made in 333 min. See also Engineering Index 1934.
Twin zephyrs placed in service
Diesel-electric articulated trains, built by Edward G. Budd Mfg Co, Philadelphia, and embodying Budd Shotweld stainless-steel construction, operates on 6 1/2-hr schedule between Chicago and St Paul; test run of 431 mi made in 333 min. See also Engineering Index 1934.
Twin zephyrs placed in service
Ry Age
Railway Age ; 98
1935
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
Zephyrs of creative destruction: understanding the management of innovation in construction
British Library Online Contents | 1998
|Enlarged twin cities zephyrs placed in service by Burlington
Engineering Index Backfile | 1936
Brooklyn's "duplex car" placed in service
Engineering Index Backfile | 1924
SERVICE CONNECTION ROOM PLACED OUTSIDE FOR FORMING A SERVICE CONNECTION
European Patent Office | 2017
|