A platform for research: civil engineering, architecture and urbanism
Chute system delivers concrete from floating plant to pier walls
Floating mixing and hoisting plant with tower-chute distributing system which mixed and placed 31,000 cu yd of concrete required in construction of pier and slip walls of portions of New York City's three new 1100-ft piers built within 15-acre area inclosed by cofferdam between West 47th and West 52nd St, North River.
Chute system delivers concrete from floating plant to pier walls
Floating mixing and hoisting plant with tower-chute distributing system which mixed and placed 31,000 cu yd of concrete required in construction of pier and slip walls of portions of New York City's three new 1100-ft piers built within 15-acre area inclosed by cofferdam between West 47th and West 52nd St, North River.
Chute system delivers concrete from floating plant to pier walls
Construction Methods
Construction Methods ; 16
1934
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.