A platform for research: civil engineering, architecture and urbanism
Report on proposed canals connecting puget sound -- Grays harbor, grays harbor -- Willapa bay and willapa bay -- Columbia river
Technical report on construction of canal system to cost over $30,000,000; economic and commercial considerations; geology; locks and water supply for lockage; unit prices; tidal date. (submitted by Canal Commission of State of Washington)
Report on proposed canals connecting puget sound -- Grays harbor, grays harbor -- Willapa bay and willapa bay -- Columbia river
Technical report on construction of canal system to cost over $30,000,000; economic and commercial considerations; geology; locks and water supply for lockage; unit prices; tidal date. (submitted by Canal Commission of State of Washington)
Report on proposed canals connecting puget sound -- Grays harbor, grays harbor -- Willapa bay and willapa bay -- Columbia river
Report Proposed Canals Connecting Puget Sound -- Grays Harbor
1933
160 pages
Figures, Diagrams, Charts, Tables
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete and steel pipe pier for Grays Harbor
Engineering Index Backfile | 1967
|Curvilinear Modeling of Nearshore Circulation at Grays Harbor
British Library Conference Proceedings | 2003
|Ports of Tacoma, Grays Harbor, and Olympia, Wash.
Engineering Index Backfile | 1954
Contractor's rock-handling methods on Grays Harbor jetty construction
Engineering Index Backfile | 1937