A platform for research: civil engineering, architecture and urbanism
Sluicing along shotover river
Features of project in New Zealand, involving building of sheet piling weir across river and diversion of water into steel flume 1500 ft long 20 ft wide and 8 ft deep, so that bed of river could be searched for gold; sluicing and elevating practice; gold saving devices and other gear; hydroelectric power plant.
Sluicing along shotover river
Features of project in New Zealand, involving building of sheet piling weir across river and diversion of water into steel flume 1500 ft long 20 ft wide and 8 ft deep, so that bed of river could be searched for gold; sluicing and elevating practice; gold saving devices and other gear; hydroelectric power plant.
Sluicing along shotover river
Chem Eng Min Rev
1935
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1906
|Engineering Index Backfile
Slotted pipe sediment sluicing
British Library Conference Proceedings | 1995
|Sediment Management Option by Sediment Sluicing in the Mimi River, Japan
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2016
|Dredging and hydraulic sluicing, Victoria, 1908
Engineering Index Backfile | 1909
|