A platform for research: civil engineering, architecture and urbanism
Unmapped eroded limestone complicates corewall job
Excavation for cutoff wall of Ontelaunee Dam at Reading, Pa, revealed extremely irregular nature of limestone rock surface which could not be predicted from exploratory borings; unusually high quantities of cement taken up by some of grouting holes.
Unmapped eroded limestone complicates corewall job
Excavation for cutoff wall of Ontelaunee Dam at Reading, Pa, revealed extremely irregular nature of limestone rock surface which could not be predicted from exploratory borings; unusually high quantities of cement taken up by some of grouting holes.
Unmapped eroded limestone complicates corewall job
Eng News-Rec
Gannett, F. (author)
Engineering News-Record ; 115
1935
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Corewall in rockfill dam tilts when reservoir fills
Engineering Index Backfile | 1932
|Earth dam with corewall to impound 4 billion gallons
Engineering Index Backfile | 1930
|River Surveys in Unmapped Territory
ASCE | 2021
|River surveys in unmapped territory
Engineering Index Backfile | 1955
|Research on Vertical Deformation Difference of Frame Corewall Structure with Strengthened Storey
British Library Conference Proceedings | 2009
|