A platform for research: civil engineering, architecture and urbanism
Method of grouting old earth-fill dam at Huguenot, NY, recently raised from height of 40 ft to 48 ft; grouting with mixture of cement and fine loam soil applied by means of portable hand force pumps.
Method of grouting old earth-fill dam at Huguenot, NY, recently raised from height of 40 ft to 48 ft; grouting with mixture of cement and fine loam soil applied by means of portable hand force pumps.
Grouting checks leakage in earthfill dam
Eng News-Rec
Wilbur, E.M. (author)
Engineering News-Record ; 115
1935
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Detection of abnormal leakage at Eberlaste earthfill dam
British Library Conference Proceedings | 2000
|Grouting checks foundation vibration
Engineering Index Backfile | 1943
Grouting checks foundation vibration
Engineering Index Backfile | 1942
Europe's highest earthfill dam
Engineering Index Backfile | 1957