A platform for research: civil engineering, architecture and urbanism
Experience in pumping cement through pipe line over mile long
Installation used at Boulder Dam in connection with making and placing concrete for dam construction; pneumatic pump unit consists of two pump tanks mounted side by side on structural support; operating cycle described; illustrated description of pneumatic cement transport line from high-level to low-level concrete mixing plant.
Experience in pumping cement through pipe line over mile long
Installation used at Boulder Dam in connection with making and placing concrete for dam construction; pneumatic pump unit consists of two pump tanks mounted side by side on structural support; operating cycle described; illustrated description of pneumatic cement transport line from high-level to low-level concrete mixing plant.
Experience in pumping cement through pipe line over mile long
Rock Products
Rock Products ; 38
1935
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tennessee 1,265-mile pipe line and stations approach completion
Engineering Index Backfile | 1944
|Zeepipe experience: developing pigs for 506-mile subsea line
Online Contents | 1994
|Building a 375-mile pipe line in 193 calendar days
Engineering Index Backfile | 1928
|A twelve-mile concrete pipe conduit
Engineering Index Backfile | 1909
Cost of Pumping Through Pipe Lines
Wiley | 1919
|