A platform for research: civil engineering, architecture and urbanism
Construction of credit river bridge
Bridge between Toronto and Hamilton, Ont, consisting principally of four spans of 145 ft and totaling 841 ft in length; excavating and pouring of concrete at 25 deg below zero; gasoline locomotives and dump cars used to convey concrete; falsework; distortion prevented.
Construction of credit river bridge
Bridge between Toronto and Hamilton, Ont, consisting principally of four spans of 145 ft and totaling 841 ft in length; excavating and pouring of concrete at 25 deg below zero; gasoline locomotives and dump cars used to convey concrete; falsework; distortion prevented.
Construction of credit river bridge
Can Engr
Jones, L.M. (author) / Rayner, C.H. (author)
Canadian Engineer ; 67
1934
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1934
|Waitaki river bridge construction
Engineering Index Backfile | 1957
|Construction of pit river bridge
Engineering Index Backfile | 1941
|Construction of abra river bridge
Engineering Index Backfile | 1935
|