A platform for research: civil engineering, architecture and urbanism
PERT and CPM techniques in project management
Integrated approach to PERT and CPM is presented underlining basic concepts; fundamental model can be visualized as network in which points or nodes correspond to events, and arrows correspond to activities; mathematics and mechanics of network analysis as it is applied to critical path computations are developed and illustrated; recent developments in areas of cost optimization and cost-time integration; simplified highway construction project illustrates application of PERT and CPM techniques in which concepts of work breakdown structure and account code structure are also incorporated.
PERT and CPM techniques in project management
Integrated approach to PERT and CPM is presented underlining basic concepts; fundamental model can be visualized as network in which points or nodes correspond to events, and arrows correspond to activities; mathematics and mechanics of network analysis as it is applied to critical path computations are developed and illustrated; recent developments in areas of cost optimization and cost-time integration; simplified highway construction project illustrates application of PERT and CPM techniques in which concepts of work breakdown structure and account code structure are also incorporated.
PERT and CPM techniques in project management
ASCE -- Proc (J Construction Div)
Aras, R.M. (author) / Surkis, J. (author)
1964
25 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
PERT and CPM Techniques in Project Management
ASCE | 2021
|British Library Conference Proceedings | 1995
|Simplified CPM-PERT Simulation Model
Online Contents | 2001
|