A platform for research: civil engineering, architecture and urbanism
Preparation of material and equipment quantity surveys for project costing; types of material by usage are outlined as well as considerations for preparation, organization, and summarization of quantities surveyed; translation of nonpermanent material into usable quantities for pricing; investigation of primary considerations for surveying equipment, all items that might be included, and logical method of analyzing installation.
Preparation of material and equipment quantity surveys for project costing; types of material by usage are outlined as well as considerations for preparation, organization, and summarization of quantities surveyed; translation of nonpermanent material into usable quantities for pricing; investigation of primary considerations for surveying equipment, all items that might be included, and logical method of analyzing installation.
Quantity surveys for cost estimates
ASCE -- Proc (J Construction Div)
Heller, G.W. (author)
1964
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Quantity Surveys for Cost Estimates
ASCE | 2021
|Quantity-Based Approach to Preliminary Cost Estimates for Highway Projects
British Library Conference Proceedings | 2006
|Quantity-Based Approach to Preliminary Cost Estimates for Highway Projects
British Library Online Contents | 2006
|Construction design chart -- Lumber quantity estimates
Engineering Index Backfile | 1949
|Taylor & Francis Verlag | 2001