A platform for research: civil engineering, architecture and urbanism
The Tata Power Company's hydro-electric project
Construction and costs of 100,000 kw. project, including curved masonry dam about 160 ft. high, side discharge spillway of 60,000-sec. ft. capacity, tunnel, penstocks, power house, 110,000-volt transmission line to Bombay, etc. (see also Water and Water Eng., vol. 31, no. 361, Jan. 21, 1929, pp. 19-20; and Engineering, vol. 127, no. 3301, Apr. 19, 1929, pp. 487-488)
The Tata Power Company's hydro-electric project
Construction and costs of 100,000 kw. project, including curved masonry dam about 160 ft. high, side discharge spillway of 60,000-sec. ft. capacity, tunnel, penstocks, power house, 110,000-volt transmission line to Bombay, etc. (see also Water and Water Eng., vol. 31, no. 361, Jan. 21, 1929, pp. 19-20; and Engineering, vol. 127, no. 3301, Apr. 19, 1929, pp. 487-488)
The Tata Power Company's hydro-electric project
Instn Civil Engrs -- Proc
Cursetjee, N.J.M. (author)
1929
37 pages
2 Supp. plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Tata Power Company's Hydro-Electric Project
Engineering Index Backfile | 1930
|The Tata Power Company's hydro-electric project
Engineering Index Backfile | 1929
|The Tata Power Company's hydro-electric project
Engineering Index Backfile | 1929
|The Tata hydro-electro power-plant Bombay -- II
Engineering Index Backfile | 1919
Engineering Index Backfile | 1905
|