A platform for research: civil engineering, architecture and urbanism
Scheduling form work
Method of detailing, standardizing and fabricating form work; savings effected through duplication; forms made up in single panels in contractor's shop and assembled when required.
Scheduling form work
Method of detailing, standardizing and fabricating form work; savings effected through duplication; forms made up in single panels in contractor's shop and assembled when required.
Scheduling form work
Concrete
Concrete ; 34
1929
3 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933