A platform for research: civil engineering, architecture and urbanism
Construction of high spillway piers of Hasdeo barrage
Features of construction of 14 bay, 60 ft span spillway of Hasdeo Dam, Madhya Pradesh; description of forms, reinforcement work, and concrete mix; work was carried out in two phases due to reduction of pier width 41 ft above crest level, from 50.04 ft to 22.30 ft; concreting up to initial four lifts was done with manual labor; sequence of concreting operations is set forth.
Construction of high spillway piers of Hasdeo barrage
Features of construction of 14 bay, 60 ft span spillway of Hasdeo Dam, Madhya Pradesh; description of forms, reinforcement work, and concrete mix; work was carried out in two phases due to reduction of pier width 41 ft above crest level, from 50.04 ft to 22.30 ft; concreting up to initial four lifts was done with manual labor; sequence of concreting operations is set forth.
Construction of high spillway piers of Hasdeo barrage
Indian J Power and River Valley Development
Sikka, D.R. (author)
1966
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1992
|Description of repairs to spillway piers of Keokuk Dam
Engineering Index Backfile | 1956
|Soil foundation spillway structure with bottom expansion type anchoring column piers
European Patent Office | 2024
|Three-Dimensional Hydromechanical Sectional Analysis of Cracked Nonprismatic Concrete Spillway Piers
British Library Online Contents | 2012
|