A platform for research: civil engineering, architecture and urbanism
Construction of prestressed concrete waste digester in Nurenberg
To obtain least ratio of digesting surface to vessel's volume, and also to reduce heat losses, digester was built in form of huge egg 45 m high, 24 m maximum ID; details of reinforcement arrangement, prestressing, waterproof concrete composition, and concreting operations.
Construction of prestressed concrete waste digester in Nurenberg
To obtain least ratio of digesting surface to vessel's volume, and also to reduce heat losses, digester was built in form of huge egg 45 m high, 24 m maximum ID; details of reinforcement arrangement, prestressing, waterproof concrete composition, and concreting operations.
Construction of prestressed concrete waste digester in Nurenberg
Bau eines vorgespannten Faulbehaelters in Nuernberg
Schaller, K. (author) / Schleeh, W. (author)
Bauingenieur ; 41
1966
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Thermal cracking in wall of prestressed concrete egg-shaped digester
British Library Conference Proceedings | 1994
|Walled green city - Mixed development, Nurenberg, Germany
Online Contents | 1997
|Prestressed concrete construction
Engineering Index Backfile | 1950
|Prestressed concrete construction
Engineering Index Backfile | 1951
|Noteworthy bridges in Bavarian section of new Frankfurt-Nurenberg Federal Highway
Engineering Index Backfile | 1965
|