A platform for research: civil engineering, architecture and urbanism
Slip-form paving beats jack frost
Description of paving 9.2 mi of 24-ft ribbons of concrete in 22 working days using slip forms which do not require fixed metal forms to support and shape edges of wet concrete; instead it depends upon moving forms, which travel with finishing machine; construction procedures are described.
Slip-form paving beats jack frost
Description of paving 9.2 mi of 24-ft ribbons of concrete in 22 working days using slip forms which do not require fixed metal forms to support and shape edges of wet concrete; instead it depends upon moving forms, which travel with finishing machine; construction procedures are described.
Slip-form paving beats jack frost
Pub Works
Public Works ; 98
1967
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1967
SLIP FORM PAVING MACHINE AND METHOD OF OPERATING A SLIP FORM PAVING MACHINE
European Patent Office | 2024
|SLIP FORM PAVING MACHINE AND METHOD OF CONTROLLING A SLIP FORM PAVING MACHINE
European Patent Office | 2024
|