A platform for research: civil engineering, architecture and urbanism
How frisco cuts costs with concrete ties
Construction of 33-mi rail line to lead-zinc mineral deposit in southeast Missouri using about 66,000 prestressed concrete ties at 31-in. centers; brief description of tie production, 1 million cu yd of rock excavation and 2 million cu yd of common excavation; two 4-span, deck-girder bridges were erected; one, 282 ft long and 35 ft high, spans Dry Creek and other, 294 ft long and 47 ft high, spans Huzzah Creek; two other steel and concrete bridges carry state primary roads over track; total of 190 culverts was installed; largest was multiplate pipe 120 ft long and 18 ft in diam, built for accommodating rural road.
How frisco cuts costs with concrete ties
Construction of 33-mi rail line to lead-zinc mineral deposit in southeast Missouri using about 66,000 prestressed concrete ties at 31-in. centers; brief description of tie production, 1 million cu yd of rock excavation and 2 million cu yd of common excavation; two 4-span, deck-girder bridges were erected; one, 282 ft long and 35 ft high, spans Dry Creek and other, 294 ft long and 47 ft high, spans Huzzah Creek; two other steel and concrete bridges carry state primary roads over track; total of 190 culverts was installed; largest was multiplate pipe 120 ft long and 18 ft in diam, built for accommodating rural road.
How frisco cuts costs with concrete ties
Ry Age
Railway Age ; 162
1967
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete ties for long frisco branch
Engineering Index Backfile | 1967
Elsevier | 1986
Online Contents | 1978
|Signal maintenance on the frisco
Engineering Index Backfile | 1928
Design - Zukunftsorientiert - Büromöbelsystem "Frisco" von Werndl
Online Contents | 1998
|