A platform for research: civil engineering, architecture and urbanism
Erection methods and temporary works for building precast concrete segmental superstructures on 2.5 mi elevated highway under construction in West London, Great Britain; problems involved in construction entailed devising special methods of construction necessitating provision of over 2000 tons of heavy temporary supporting steelwork; problem solutions adopted, and temporary works and special plant provided in connection with construction of two post tensioned segmental precast concrete sections are described. (26375)
Erection methods and temporary works for building precast concrete segmental superstructures on 2.5 mi elevated highway under construction in West London, Great Britain; problems involved in construction entailed devising special methods of construction necessitating provision of over 2000 tons of heavy temporary supporting steelwork; problem solutions adopted, and temporary works and special plant provided in connection with construction of two post tensioned segmental precast concrete sections are described. (26375)
Western avenue extension
Struct Eng
Huntley, H.D. (author)
Structural Engineer ; 47
1969
13 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Western avenue tunnel extension
Engineering Index Backfile | 1922
LETTERS - Ghastly green pollution in Western Avenue
Online Contents | 1993
Unit-construction footbridge over western avenue at Greenford
Engineering Index Backfile | 1938
Unit-construction footbridge over western avenue at Greenford
Engineering Index Backfile | 1938
Junipero Serra Boulevard and Nineteenth Avenue Extension, San Francisco
Engineering Index Backfile | 1929