A platform for research: civil engineering, architecture and urbanism
Recently completed reinforced concrete structure
New Terylene yarn processing plant at Wilton built for Imperial Chemical Industries Ltd, which is part two story and part single story with area of 230,000 sq ft; prestressed and shell concrete roofing has been used, particularly in main production hall, where use of long span prestressed shell construction provides 120 ft spans of uninterrupted floor space; emphasis on construction of roof and of floor 21 ft 6 in. above ground level. (See also Civ Eng (Lond) v 50 n 592 Oct 1955 p 1113-4)
Recently completed reinforced concrete structure
New Terylene yarn processing plant at Wilton built for Imperial Chemical Industries Ltd, which is part two story and part single story with area of 230,000 sq ft; prestressed and shell concrete roofing has been used, particularly in main production hall, where use of long span prestressed shell construction provides 120 ft spans of uninterrupted floor space; emphasis on construction of roof and of floor 21 ft 6 in. above ground level. (See also Civ Eng (Lond) v 50 n 592 Oct 1955 p 1113-4)
Recently completed reinforced concrete structure
Concrete Constr Eng
1955
4 pages
Diagrams
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Recently completed reinforced concrete structure
Engineering Index Backfile | 1955
Long-span Prestressed Concrete Bridges Completed Recently in China
British Library Online Contents | 1999
|Glenbawn dam [midline ellipsis] construction recently completed
Engineering Index Backfile | 1958
Three recently completed projects by Dublin practice McCullough Mulvin
Online Contents | 2008
Wellingborough Car Park - A desalination project recently completed in Northamptonshire
Online Contents | 1996
|