A platform for research: civil engineering, architecture and urbanism
New works of sewerage and sewage disposal, Taunton
Present sewerage scheme in Borough of Taunton consists of two separate systems, known as high level system and low level system; scheme commences with interception of high level sewer near its entry to existing works; after making connection with low level sewer, it becomes 72 in. in diam; flow will pass through venturi flume to any of three sedimentation tanks having total capacity of 1375 gal. (see also Surveyor v 113 n 3269 Oct 30 1954 p 934-6)
New works of sewerage and sewage disposal, Taunton
Present sewerage scheme in Borough of Taunton consists of two separate systems, known as high level system and low level system; scheme commences with interception of high level sewer near its entry to existing works; after making connection with low level sewer, it becomes 72 in. in diam; flow will pass through venturi flume to any of three sedimentation tanks having total capacity of 1375 gal. (see also Surveyor v 113 n 3269 Oct 30 1954 p 934-6)
New works of sewerage and sewage disposal, Taunton
Instn Mun Engrs -- J
Tyzack, E.R. (author) / Waters, A. (author)
1955
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New works of sewerage and sewage disposal, Taunton
Engineering Index Backfile | 1954
|Southampton's new sewerage and sewage disposal works
Engineering Index Backfile | 1937
Southampton's new sewerage and sewage disposal works
Engineering Index Backfile | 1937
Sewerage and sewage disposal works at ruislip-northwood
Engineering Index Backfile | 1909
|Engineering Index Backfile | 1930