A platform for research: civil engineering, architecture and urbanism
London's first comprehensive school
New secondary school for girls, designed for initial roll of 1700 pupils; main assembly hall is covered by 3-in. thick concrete dome; boundary walls are post tensioned by Freyssinet system; total cost 786,000 pounds.
London's first comprehensive school
New secondary school for girls, designed for initial roll of 1700 pupils; main assembly hall is covered by 3-in. thick concrete dome; boundary walls are post tensioned by Freyssinet system; total cost 786,000 pounds.
London's first comprehensive school
Civ Structural Engrs Rev
1954
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
London's first comprehensive school almost complete
Engineering Index Backfile | 1954
London's first electric tramway
Engineering Index Backfile | 1901
|London's underground -- World's first subway
Engineering Index Backfile | 1960
|School building-stock climate resilience: evaluating London’s school stock overheating performance
Taylor & Francis Verlag | 2024
|World First at London's City University
British Library Online Contents | 1994