A platform for research: civil engineering, architecture and urbanism
Glasgow-stirling Trunk road (A.80): -- Widening and reconstruction proposals
Survey to obtain information on nature and bearing value of soil and thickness and type of new construction required; road is designed for speed of 50 mph; details of construction over peat and on clay subgrade; drainage and surfacing.
Glasgow-stirling Trunk road (A.80): -- Widening and reconstruction proposals
Survey to obtain information on nature and bearing value of soil and thickness and type of new construction required; road is designed for speed of 50 mph; details of construction over peat and on clay subgrade; drainage and surfacing.
Glasgow-stirling Trunk road (A.80): -- Widening and reconstruction proposals
Instn Mun Engrs -- J
Fraser, G. (author)
1954
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Widening and reconstruction of road bridges
Engineering Index Backfile | 1961
|Reconstruction of Nithsdale road bridge, Glasgow
Engineering Index Backfile | 1951
Widening trunk lines vs. building parallel highways
Engineering Index Backfile | 1927
|Track reconstruction and road widening in Toronto suburbs
Engineering Index Backfile | 1929