A platform for research: civil engineering, architecture and urbanism
Office building of 370,000 sq ft erected by lift slab method
Building to house personnel of five Ford Motor Co manufacturing divisions at River Rouge plant in Dearborn, Mich; structure has three stories, and is expected to house 2500 people; lifting was accomplished in sections varying from 2570 to 4750 sq ft, on 10 or 12 jacks; comparison between safety of lift slab method and ordinary forming. (see also similar unsigned description in Engineer v 200 n 5202 Oct 7 1955 p 527-9)
Office building of 370,000 sq ft erected by lift slab method
Building to house personnel of five Ford Motor Co manufacturing divisions at River Rouge plant in Dearborn, Mich; structure has three stories, and is expected to house 2500 people; lifting was accomplished in sections varying from 2570 to 4750 sq ft, on 10 or 12 jacks; comparison between safety of lift slab method and ordinary forming. (see also similar unsigned description in Engineer v 200 n 5202 Oct 7 1955 p 527-9)
Office building of 370,000 sq ft erected by lift slab method
Civ Eng (NY)
Perry, J.P.H. (author)
1955
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Six stories of prestressed slabs erected by lift-slab methods
Engineering Index Backfile | 1957
|Seaboard office building put up by 'lift-slab' technique
Engineering Index Backfile | 1957
Seaboard office building put up by 'lift-slab' technique
Engineering Index Backfile | 1957
"Unilever House" office building erected for "Royale Belge"
Engineering Index Backfile | 1956
|Barracks erected with vacuum lift
Engineering Index Backfile | 1953