A platform for research: civil engineering, architecture and urbanism
Some recent skip installations in Wigan area
Installation of skip winding in coal mines with daily output of 200 to 500 tons; development of design to conform with desirable feature; trial installations and results obtained; man riding in skip shafts; dust problem.
Some recent skip installations in Wigan area
Installation of skip winding in coal mines with daily output of 200 to 500 tons; development of design to conform with desirable feature; trial installations and results obtained; man riding in skip shafts; dust problem.
Some recent skip installations in Wigan area
Colliery Guardian
Belfitt, J.G. (author) / Birch, J. (author)
Colliery Guardian ; 190
1955
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Wigan flood detention reservoir
British Library Conference Proceedings | 2010
|British Library Online Contents | 2006
Reconstruction of Omnibus depot at Melverley streets, Wigan
Engineering Index Backfile | 1944
|