A platform for research: civil engineering, architecture and urbanism
High speed hard-rock tunneling for California hydroelectric project
Driving of Pacific Gas and Electric Co 9 1/2 × 11 ft heading, 1060 ft long, in 75 shifts on job to eliminate old timber flume in Central California; distribution of direct costs; record of electric power consumption; mucking and hauling; rotation of crews.
High speed hard-rock tunneling for California hydroelectric project
Driving of Pacific Gas and Electric Co 9 1/2 × 11 ft heading, 1060 ft long, in 75 shifts on job to eliminate old timber flume in Central California; distribution of direct costs; record of electric power consumption; mucking and hauling; rotation of crews.
High speed hard-rock tunneling for California hydroelectric project
Western Construction News
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Kerckhoff hydroelectric project in California
Engineering Index Backfile | 1921
|Engineering Index Backfile | 1939
|Creative Conflict Resolution: Don Pedro Hydroelectric Project, California
British Library Conference Proceedings | 1997
|Alternative Dispute Resolution Don Pedro Hydroelectric Project, California
British Library Conference Proceedings | 1997
|