A platform for research: civil engineering, architecture and urbanism
Metro in Moscow
Completion of second line of subway system has added length of 8.6 mi to route; new line comprises what is known as Potroski radium and Gorky radius; third line, under construction, is scheduled for completion by end of 1939; when 3 lines are completed subway will have total length of 26.7 mi, nearly twothirds will be in deep tunnels; there will be 28 stations; distances between stations vary; method of construction. (See also Transit J v 82 n 12 Nov 1938 p 444-5 and 474)
Metro in Moscow
Completion of second line of subway system has added length of 8.6 mi to route; new line comprises what is known as Potroski radium and Gorky radius; third line, under construction, is scheduled for completion by end of 1939; when 3 lines are completed subway will have total length of 26.7 mi, nearly twothirds will be in deep tunnels; there will be 28 stations; distances between stations vary; method of construction. (See also Transit J v 82 n 12 Nov 1938 p 444-5 and 474)
Metro in Moscow
Civ Eng (Lond)
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design of deep Moscow Metro stations
British Library Conference Proceedings | 1999
|The First Turn of Mini-Metro in Moscow
British Library Conference Proceedings | 2004
|Urban design in underground public spaces: lessons from Moscow Metro
Taylor & Francis Verlag | 2022
|