A platform for research: civil engineering, architecture and urbanism
"Third-Step" construction at Bonneville dam
Construction of ogee section in six bays of main spillway structure; description of unusual cofferdams, or bulkheads, that were used to unwater each of bays in turn; seasonal operation during construction; chutes for delivering concrete.
"Third-Step" construction at Bonneville dam
Construction of ogee section in six bays of main spillway structure; description of unusual cofferdams, or bulkheads, that were used to unwater each of bays in turn; seasonal operation during construction; chutes for delivering concrete.
"Third-Step" construction at Bonneville dam
Civ Eng (NY)
Torpen, B.E. (author) / Hartman, O.C. (author)
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction problems at Bonneville dam
Engineering Index Backfile | 1936
|British Library Online Contents | 1999
Aggregates production at Bonneville
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1936