A platform for research: civil engineering, architecture and urbanism
Details of new Columbia Parkway of Cincinnati, skirting Ohio River for about 7 mi; viaducts; half-viauducts, retaining walls, approach ramps and other structures; transport purposes of road; future connections; total cost of entire project is $8,623,000.
Details of new Columbia Parkway of Cincinnati, skirting Ohio River for about 7 mi; viaducts; half-viauducts, retaining walls, approach ramps and other structures; transport purposes of road; future connections; total cost of entire project is $8,623,000.
Scenic City entrance road
Eng News-Rec
Kranz, H.H. (author)
Engineering News-Record ; 121
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Revisiting the Twin City Scenic Collection
British Library Online Contents | 1997
|Scenic Applaus. Fahrbericht Renault Scenic
Automotive engineering | 1999
|Road test: Renault Grand Scenic 1,4 TCe Dynamique
Automotive engineering | 2009
|Road test: Renault Grand Scenic 1,9 dCi Dynamique
Automotive engineering | 2009
|In Scenic gesetzt. Test Renault Scenic
Automotive engineering | 2003
|