A platform for research: civil engineering, architecture and urbanism
Design and construction of 27-mi four-lane divided highway from Baltimore to Havre de Grace, Maryland; problem of settlement of swamp fills solved by blasting; water problems; quantities and costs; future extension to Delaware state line.
Design and construction of 27-mi four-lane divided highway from Baltimore to Havre de Grace, Maryland; problem of settlement of swamp fills solved by blasting; water problems; quantities and costs; future extension to Delaware state line.
Notable dual road completed
Eng News-Rec
Smith, N.L. (author)
Engineering News-Record ; 121
1938
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1944
British Library Online Contents | 1997
North America - Textile Road PCB site clean-up completed
Online Contents | 2000
London-dover road, A.2 Swanscombe-Rochester dualling completed
Engineering Index Backfile | 1966