A platform for research: civil engineering, architecture and urbanism
New station for Christchurch, New Zealand
Notes on design, refreshment arrangements, luggage and parcel accommodation and subway, offices, heating and ventilation, and roof nursery of new station which has total frontage of 564 ft and max depth of 104 ft, and will be of steel frame type with reinforced concrete floors and roof.
New station for Christchurch, New Zealand
Notes on design, refreshment arrangements, luggage and parcel accommodation and subway, offices, heating and ventilation, and roof nursery of new station which has total frontage of 564 ft and max depth of 104 ft, and will be of steel frame type with reinforced concrete floors and roof.
New station for Christchurch, New Zealand
Ry Gaz
Railway Gazette ; 69
1938
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New station for Christchurch, New Zealand
Engineering Index Backfile | 1938
Carlton bridge. Christchurch, New Zealand
Engineering Index Backfile | 1934
|Christchurch rebuild, New Zealand: alliancing with a difference
Online Contents | 2015
|Briefing: Affirming alliancing procurement for Christchurch rebuild, New Zealand
Online Contents | 2015
|Shigeru Ban Architects Cardboard Cathedral, Christchurch, New Zealand
British Library Online Contents | 2013