A platform for research: civil engineering, architecture and urbanism
Description of special works designed to remove some 50,000 tons of silt per day from Colorado River water entering All-American Canal, including settling basins covering almost 30 acres, and 72 rotary scrapers each 125 ft in diam; economic necessity of providing for silt removal; controlling scraper mechanisms; construction methods; rock-picking machine. (see also Civ Eng (NY) v 8 n 10 Oct 1938 p 649-52)
Description of special works designed to remove some 50,000 tons of silt per day from Colorado River water entering All-American Canal, including settling basins covering almost 30 acres, and 72 rotary scrapers each 125 ft in diam; economic necessity of providing for silt removal; controlling scraper mechanisms; construction methods; rock-picking machine. (see also Civ Eng (NY) v 8 n 10 Oct 1938 p 649-52)
Desilting works at Imperial dam
Reclamation Era
Forester, D.M. (author)
Reclamation Era ; 28
1938
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Desilting works at imperial dam
Engineering Index Backfile | 1938
|Desilting works at Imperial dam
Engineering Index Backfile | 1938
|Desilting works at imperial dam
Engineering Index Backfile | 1938
|Imperial dam and desilting works on Colorado river
Engineering Index Backfile | 1939
Imperial dam and desilting works on Colorado river
Engineering Index Backfile | 1938