A platform for research: civil engineering, architecture and urbanism
Prefabrication of concrete forms for power house permits operation same year as initiation of construction; outdoor equipment cuts costs; available to Idaho Power Co system are 18,000 kw of hydro generating capacity from this sixth of Company's developments on Snake River. (See also Elec World v 109 n 7 Feb 12 1938 p 52-4 and 118-20)
Prefabrication of concrete forms for power house permits operation same year as initiation of construction; outdoor equipment cuts costs; available to Idaho Power Co system are 18,000 kw of hydro generating capacity from this sixth of Company's developments on Snake River. (See also Elec World v 109 n 7 Feb 12 1938 p 52-4 and 118-20)
Upper salmon falls harnessed for power
Western Construction News
Senger, H.L. (author)
1938
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Upper salmon falls harnessed for power
Engineering Index Backfile | 1938
|Upper salmon falls harnessed for power
Engineering Index Backfile | 1938
|Upper salmon falls harnessed for power
Engineering Index Backfile | 1938
|New upper salmon falls hydroelectric development
Engineering Index Backfile | 1938
New upper salmon falls hydroelectric development
Engineering Index Backfile | 1938