A platform for research: civil engineering, architecture and urbanism
Completion of tower of Boston's new Old South Church to roof peak 220 ft above street level; novel scaffolding devised; plant layout designed to utilize limited space available for construction.
Completion of tower of Boston's new Old South Church to roof peak 220 ft above street level; novel scaffolding devised; plant layout designed to utilize limited space available for construction.
Tower reconstruction completed
Eng News-Rec
Egelhoff, R.F. (author)
Engineering News-Record ; 120
1938
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tower reconstruction completed
Engineering Index Backfile | 1938
|Reconstruction completed at Peruca
Online Contents | 1995
Construction method for tower crane foundation installation on completed concrete structure
European Patent Office | 2023
|First unit of reconstruction on Franklin canyon highway completed
Engineering Index Backfile | 1943
|British Library Online Contents | 1998