A platform for research: civil engineering, architecture and urbanism
Balanced cantilever erection of twin tied arches
Design and construction of highway bridge over Connecticut River, between Middletown and Portland, Conn, consisting of two 600-ft three-hinged tied arches and plate girder approaches, total length 3420 ft; cable tieback system; reeving and adjusting cables; jacking; closing of arch spans.
Balanced cantilever erection of twin tied arches
Design and construction of highway bridge over Connecticut River, between Middletown and Portland, Conn, consisting of two 600-ft three-hinged tied arches and plate girder approaches, total length 3420 ft; cable tieback system; reeving and adjusting cables; jacking; closing of arch spans.
Balanced cantilever erection of twin tied arches
Eng News-Rec
Kirkley, L.F. (author)
Engineering News-Record ; 121
1938
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Balanced cantilever erection of twin tied arches
Engineering Index Backfile | 1938
|Twin tied arches for Baltimore bridge
Engineering Index Backfile | 1937
|Erection of balanced-cantilever bridge over Connecticut river
Engineering Index Backfile | 1938
Wind-induced effects during balanced cantilever bridge erection
British Library Conference Proceedings | 2002
|Erection of balanced-cantilever bridge over Connecticut river
Engineering Index Backfile | 1938