A platform for research: civil engineering, architecture and urbanism
Strengthening of old concrete arch bridge, consisting of two 12 m spans, at Gleiwitz, Germany, by extensive cement grouting. (See also - n 54 discussion Dec 17 discussion p 722)
Strengthening of old concrete arch bridge, consisting of two 12 m spans, at Gleiwitz, Germany, by extensive cement grouting. (See also - n 54 discussion Dec 17 discussion p 722)
Die Instandsetzung der gewoelbten Eisenbahnbruecke ueber das Beuthener Wasser bei Gleiwitz
Die Instandsetzung der gewoelbten Eisenbahnbruecke ueber das Beuthener Wasser bei Gleiwitz
Roloff (author)
Bautechnik ; 15
1937
4 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Die Instandsetzung der gewoelbten Eisenbahnbruecke ueber das Beuthener Wasser bei Gleiwitz
Engineering Index Backfile | 1937
|Verstaerkung einer gewoelbten Eisenbahnbruecke
Engineering Index Backfile | 1940
|Die Muengstener Eisenbahnbruecke ueber das Tal der Wupper
British Library Conference Proceedings | 1997
|Umbau der Eisenbahnbruecke ueber die Weser in Bremen
Engineering Index Backfile | 1932
|