A platform for research: civil engineering, architecture and urbanism
The erection of the Newtown Creek bridge
Illustrated description of a bridge consisting of two approaches connected by a two-leaf Scherzer draw span of about 150 ft. clear opening. (600 w.) (No. 80992)
The erection of the Newtown Creek bridge
Illustrated description of a bridge consisting of two approaches connected by a two-leaf Scherzer draw span of about 150 ft. clear opening. (600 w.) (No. 80992)
The erection of the Newtown Creek bridge
Eng Rec
1906
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The newtown creek hydraulic bascule bridge
Engineering Index Backfile | 1896
COMMENDABLE ACHIEVEMENT - Newtown Creek Wastewater Treatment Plant
Online Contents | 2009
The erection of the great tonoloway creek bridge
Engineering Index Backfile | 1905
Treatment Enhancement at Newtown Creek - Pilot Plant Testing at 20 MGD
British Library Conference Proceedings | 1996
|