A platform for research: civil engineering, architecture and urbanism
Subaqueous vehicular tunnel under construction at Pasadena, Texas
Highway tunnel under Houston Ship Channel will replace ferry; tunnel, being built by trench method, will be 3786 ft long between grade points and 2936 ft long between portals, with 6% grades, and will provide clear channel depth of 45 ft; concreting methods; approach tunnel details; high speed ventilation.
Subaqueous vehicular tunnel under construction at Pasadena, Texas
Highway tunnel under Houston Ship Channel will replace ferry; tunnel, being built by trench method, will be 3786 ft long between grade points and 2936 ft long between portals, with 6% grades, and will provide clear channel depth of 45 ft; concreting methods; approach tunnel details; high speed ventilation.
Subaqueous vehicular tunnel under construction at Pasadena, Texas
Roads Streets
Smith, W.H. (author)
Roads and Streets ; 92
1949
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Subaqueous tunnel construction
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1940
|Boston builds subaqueous vehicular tunnel at record speed
Engineering Index Backfile | 1932
|Construction of subaqueous vehicular tunnels by sinking method
Engineering Index Backfile | 1955
|Subaqueous tunnel and tunnel bridge structures
Engineering Index Backfile | 1954
|