A platform for research: civil engineering, architecture and urbanism
Slackline cableway employed in high bank deposit
Slackline cableway at plant near Burlington, Wis, delivers 1400 tons per day of sand and gravel from 200 ft high face to primary hopper; description of sand processing; surge pile enables plant to continue operation during periods when drag scraper is down or pit is not operating.
Slackline cableway employed in high bank deposit
Slackline cableway at plant near Burlington, Wis, delivers 1400 tons per day of sand and gravel from 200 ft high face to primary hopper; description of sand processing; surge pile enables plant to continue operation during periods when drag scraper is down or pit is not operating.
Slackline cableway employed in high bank deposit
Rock Products
Mocine, D. (author)
Rock Products ; 52
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sand and gravel excavation;: power scraper, slackline cableway excavator, and hydraulic giant
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1922
|