A platform for research: civil engineering, architecture and urbanism
More monel for Metropolitan Museum of Art
Latest portion of Museum to be roofed with monel employs standing seam construction for sloping decks and flat seam construction for flat decks; new monel covered area totals some 30,000 sq ft, while about 10,000 ft of skylights have also been installed; description of shop fabrication and installation.
More monel for Metropolitan Museum of Art
Latest portion of Museum to be roofed with monel employs standing seam construction for sloping decks and flat seam construction for flat decks; new monel covered area totals some 30,000 sq ft, while about 10,000 ft of skylights have also been installed; description of shop fabrication and installation.
More monel for Metropolitan Museum of Art
Sheet Metal Worker
Sheet Metal Worker ; 40
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|The Metropolitan Museum of Art
UB Braunschweig | 1980
|Tapestries at the Metropolitan Museum
DataCite | 1912
|Corrosion behaviour of Monel in phosphoric acid
British Library Online Contents | 2000
|