A platform for research: civil engineering, architecture and urbanism
Problems encountered in Chicago's Halstead Street widening project; granite block pavement strips replaced by 10-in. reinforced concrete except in area between street car tracks; 12-ft sidewalks replaced by 7 1/2-ft walks; paver used in midst of dense traffic; mobile loaders working from portable batch plant speeded curb and walk work.
Problems encountered in Chicago's Halstead Street widening project; granite block pavement strips replaced by 10-in. reinforced concrete except in area between street car tracks; 12-ft sidewalks replaced by 7 1/2-ft walks; paver used in midst of dense traffic; mobile loaders working from portable batch plant speeded curb and walk work.
Too much traffic, too little cement
Roads Streets
Maxwell, H.M. (author)
Roads and Streets ; 92
1949
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
TOO MUCH HERE, TOO LITTLE THERE
Taylor & Francis Verlag | 1986
|So Much Pavement, So Little Time
British Library Online Contents | 1993
|How oneonta accomplished much from little
Engineering Index Backfile | 1945
|Using panel data: Much effort, little reward?
Online Contents | 1995
|Impacts of Marine Recreation in the Americas: How Much Is Too Little - How Much Is Too Much?
British Library Conference Proceedings | 1995
|