A platform for research: civil engineering, architecture and urbanism
Surface of Santa Ana Freeway, Calif, is 8 in. concrete pavement, supported by 4 in. cement treated subgrade; construction described with data on equipment used; subgrade was covered with seal of liquid asphalt SC-6 emulsion sprayed at pressure of 90 lb per sq in.
Surface of Santa Ana Freeway, Calif, is 8 in. concrete pavement, supported by 4 in. cement treated subgrade; construction described with data on equipment used; subgrade was covered with seal of liquid asphalt SC-6 emulsion sprayed at pressure of 90 lb per sq in.
Firm foundation
Calif Highways Pub Works
Brady, W.V. (author)
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2009
|Online Contents | 2009
|A firm foundation for Chinese high speed
IuD Bahn | 2007
A firm foundation for major US dams
British Library Online Contents | 1998
|Strength in Depth: A Firm Foundation for Nordic Equipment Suppliers
Online Contents | 2011