A platform for research: civil engineering, architecture and urbanism
Dredge reclaims 200 acres of marsh
Reclaimed land for Port of Oakland involves 2,371,000 cu yd for 200 acre dredged fill; principal equipment was shore powered dredge, Duwamish, with 24 in. discharge aperture; maximum length of discharge pipe was 6000 ft mounted on pontoons and crossing channels on trestle.
Dredge reclaims 200 acres of marsh
Reclaimed land for Port of Oakland involves 2,371,000 cu yd for 200 acre dredged fill; principal equipment was shore powered dredge, Duwamish, with 24 in. discharge aperture; maximum length of discharge pipe was 6000 ft mounted on pontoons and crossing channels on trestle.
Dredge reclaims 200 acres of marsh
Western Construction News
1949
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Trafficway reclaims waterfront
Engineering Index Backfile | 1940
Marsh Building with Dredge Spoil in North Carolina
NTIS | 1972
|Marsh Building With Dredge Spoil in North Carolina
NTIS | 1972
|Baltimore, Md., reclaims its streets
Engineering Index Backfile | 1948
San Francisco Reclaims Its Downtown Waterfront
British Library Online Contents | 1996
|