A platform for research: civil engineering, architecture and urbanism
Canadian pacific new terminal at Nanaimo
Incorporating latest features for fast handling of passengers and freight, and built at cost of $1,700,000, CPR terminal at Nanaimo, Vancouver Island, is designed and equipped to accommodate traffic moving by road, rail, and water; passenger section of layout is 2-story building of concrete construction, with waiting room accommodation for 3000 persons; freight sheds provide storage area of 28,000 sq ft.
Canadian pacific new terminal at Nanaimo
Incorporating latest features for fast handling of passengers and freight, and built at cost of $1,700,000, CPR terminal at Nanaimo, Vancouver Island, is designed and equipped to accommodate traffic moving by road, rail, and water; passenger section of layout is 2-story building of concrete construction, with waiting room accommodation for 3000 persons; freight sheds provide storage area of 28,000 sq ft.
Canadian pacific new terminal at Nanaimo
Can Transportation
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
From Commission to Port Authority - Nanaimo
British Library Online Contents | 1998
Nanaimo Citizens Relax at Pioneer Waterfront Plaza
British Library Online Contents | 1998
Barnes House: Nanaimo, British Columbia
British Library Online Contents | 1996
Nanaimo: Study proves Economic Impact of Port
British Library Online Contents | 2003
Nanaimo: Busy time for the Port Authority
British Library Online Contents | 2003