A platform for research: civil engineering, architecture and urbanism
Skyscraper rushed to completion by good scheduling
Methods which made possible rapid erection of 36-story office building in congested section of New York City; building which will contain 800,000 sq ft floor area of which 660,000 sq ft will be rentable, has structural steel frame with Columns 17 to 26 ft apart; floors consist of 4 in. slab of mesh reinforced concrete; cost is estimated at $20,000,000.
Skyscraper rushed to completion by good scheduling
Methods which made possible rapid erection of 36-story office building in congested section of New York City; building which will contain 800,000 sq ft floor area of which 660,000 sq ft will be rentable, has structural steel frame with Columns 17 to 26 ft apart; floors consist of 4 in. slab of mesh reinforced concrete; cost is estimated at $20,000,000.
Skyscraper rushed to completion by good scheduling
Eng News-Rec
Engineering News-Record ; 143
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
WT Opinion ... Rushed or Crushed
Online Contents | 2001
Elsevier | 1985
|TIBKAT | 1990
|Engineering Index Backfile | 1933