A platform for research: civil engineering, architecture and urbanism
Buried membrane lining developed by Bureau of Reclamation consists of thick membranes of special pure asphalt, protected by coverings of earth or gravel; membrane is applied by spraying special asphalt cements, liquefied by temperatures of from 350 to 400 F; average cost is $0.43 per sq yd; advantages of method; work stages illustrated.
Buried membrane lining developed by Bureau of Reclamation consists of thick membranes of special pure asphalt, protected by coverings of earth or gravel; membrane is applied by spraying special asphalt cements, liquefied by temperatures of from 350 to 400 F; average cost is $0.43 per sq yd; advantages of method; work stages illustrated.
Canal seepage control at low cost
Western Construction News
Benson, J.R. (author)
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
|ASCE | 2021
|Chemical sealants and canal seepage
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1944
|Study on Geosynthetics in Canal Seepage Control Project
Trans Tech Publications | 2013
|