A platform for research: civil engineering, architecture and urbanism
Norway
Illustrated data on Nore I and Nore II plant with total capacity of 225,000 kw; Tunhoevd concrete dam forms reservoir of 360 million cu m; powerhouse of Nore II is equipped with 2 turbines of 50,000 kw capacity; concrete arch Roedberg dam of Nore I is 26 m high; from lake formed by this dam, tunnel carries water to power station II; power generated is sent back to transformer station I and from here distributed.
Norway
Illustrated data on Nore I and Nore II plant with total capacity of 225,000 kw; Tunhoevd concrete dam forms reservoir of 360 million cu m; powerhouse of Nore II is equipped with 2 turbines of 50,000 kw capacity; concrete arch Roedberg dam of Nore I is 26 m high; from lake formed by this dam, tunnel carries water to power station II; power generated is sent back to transformer station I and from here distributed.
Norway
Water Power
Water Power ; 1
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NORWAY - Norway company profiles
Online Contents | 2001
Norway Trade Fairs, Oslo, Norway
British Library Online Contents | 2003
|NORWAY - Norway exhibitors at OTC
Online Contents | 2001
Online Contents | 1993
Online Contents | 1993