A platform for research: civil engineering, architecture and urbanism
Project includes Lower Salmon dam, Bliss Hydroelectrical Development dam, Upper and Lower Malad dams and power houses, and Upper Salmon project; all dams are gravity type concrete structures requiring from 30,500 to 100,000 cu yd of concrete and generating from 20,700 to 69,000 kw.
Project includes Lower Salmon dam, Bliss Hydroelectrical Development dam, Upper and Lower Malad dams and power houses, and Upper Salmon project; all dams are gravity type concrete structures requiring from 30,500 to 100,000 cu yd of concrete and generating from 20,700 to 69,000 kw.
Idaho power's $50,000,000 program
Pac Bldr Engr
Laing, R. (author)
1948
4 pages
Photographs
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Using Cloud Seeding to Lower Costs: Idaho Power's Story
British Library Online Contents | 2006
|New Orleans builds $50,000,000 union passenger terminal project
Engineering Index Backfile | 1952
|Duke Power's Concrete Dam Stability and Remediation Program
British Library Conference Proceedings | 1995
|Power's 1972 environmental awards
Tema Archive | 1972