A platform for research: civil engineering, architecture and urbanism
Underpinning of two historical buildings in Lille
Rihour palace and St Maurice church; procedure using piles and lifting jacks; 87 Mega piles 25 cm in diam used for palace foundation, carrying from 35 to 40 tons each; church underpinning performed with Forum piles, 40 cm in diam, drilled down to chalk formation and Mega piles; safety required obtained by charging piles by hydraulic jacks.
Underpinning of two historical buildings in Lille
Rihour palace and St Maurice church; procedure using piles and lifting jacks; 87 Mega piles 25 cm in diam used for palace foundation, carrying from 35 to 40 tons each; church underpinning performed with Forum piles, 40 cm in diam, drilled down to chalk formation and Mega piles; safety required obtained by charging piles by hydraulic jacks.
Underpinning of two historical buildings in Lille
Reprise en sous-oeuvre de deux monuments historiques, a Lille
Gordon, R. (author)
1948
7 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Moving and underpinning buildings
Engineering Index Backfile | 1901
Closure to Underpinning Buildings
ASCE | 2021
|Discussion on Underpinning Buildings
ASCE | 2021
|Discussion on Underpinning Heavy Buildings
ASCE | 2021
|The Underpinning of Heavy Buildings
ASCE | 2021
|