A platform for research: civil engineering, architecture and urbanism
Cherry creek dam -- Embankment, outlet works rise fast
Roll filled earth dam of 140 ft height, containing 13 million cu yd of material is being built to provide flood protection of City of Denver, Colo; upstream slope is to be faced with 18 in. of dumped riprap; downstream slope will be covered with topsoil and seeded with grasses; data on embankment, spillway, outlet works and equipment.
Cherry creek dam -- Embankment, outlet works rise fast
Roll filled earth dam of 140 ft height, containing 13 million cu yd of material is being built to provide flood protection of City of Denver, Colo; upstream slope is to be faced with 18 in. of dumped riprap; downstream slope will be covered with topsoil and seeded with grasses; data on embankment, spillway, outlet works and equipment.
Cherry creek dam -- Embankment, outlet works rise fast
Western Construction News
Smyser, C. (author)
1948
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Completion of Embankment, Spillway and Outlet Works
NTIS | 1990
|Granger Lake, Embankment-Outlet Works-Spillway. Volume 1
NTIS | 1983
|Granger Lake, Embankment-Outlet Works-Spillway. Volume 2
NTIS | 1983
|Outlet works, Black Butte dam Stoney creek, California
Engineering Index Backfile | 1960
|