A platform for research: civil engineering, architecture and urbanism
Construction of Castelo-Do-Dode Dam, Portugal
Dam is of arch type, with max height of 377 ft and vertical upstream face of 492 ft radius; total volume of concrete 523,000 cu yd; spillway designed for discharge of 4100 cu m per sec; layout of constructional plant, including cableway excavators, washing and screening plant, ropeways, concrete mixers, derricks, etc; photographs, sectional drawings. (See also Engineer v 188 n 4879, 4880, 4881, July 29 1949 p 112-5, Aug 5 p 142-5, Aug 12 p 162-4)
Construction of Castelo-Do-Dode Dam, Portugal
Dam is of arch type, with max height of 377 ft and vertical upstream face of 492 ft radius; total volume of concrete 523,000 cu yd; spillway designed for discharge of 4100 cu m per sec; layout of constructional plant, including cableway excavators, washing and screening plant, ropeways, concrete mixers, derricks, etc; photographs, sectional drawings. (See also Engineer v 188 n 4879, 4880, 4881, July 29 1949 p 112-5, Aug 5 p 142-5, Aug 12 p 162-4)
Construction of Castelo-Do-Dode Dam, Portugal
Civ Eng (Lond)
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Castelo-Do-Bode Dam, Portugal
Engineering Index Backfile | 1949
Concreting plant at Castelo do Bode dam, Portugal
Engineering Index Backfile | 1950
Concreting plant at Castelo do Bode dam, Portugal
Engineering Index Backfile | 1950
DataCite | 1929
|Auditorium do Instituto Politécnico de Viana do Castelo, Portugal
Online Contents | 1996
|