A platform for research: civil engineering, architecture and urbanism
Placing concrete as a monolith -- Chats falls power development
Way in which concrete was placed in headworks to height of 66 ft in 25 hr continuous work, and how four pilasters in wall of power house, 50 ft in height, were completed in 10 hr.
Placing concrete as a monolith -- Chats falls power development
Way in which concrete was placed in headworks to height of 66 ft in 25 hr continuous work, and how four pilasters in wall of power house, 50 ft in height, were completed in 10 hr.
Placing concrete as a monolith -- Chats falls power development
Concrete
Bilton, V.R. (author)
Concrete ; 57
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Power development at Chats Falls
Engineering Index Backfile | 1931
Concreting problems -- Chats Falls power development
Engineering Index Backfile | 1933
|Construction features of Chats Falls development
Engineering Index Backfile | 1933
|Construction features of Chats Falls development
Engineering Index Backfile | 1933
|Chats Falls-Beauharnois 220 kv. Extension
Engineering Index Backfile | 1932